Abu Dabous, S (2008) A decision support methodology for rehabilitation management of concrete bridges, Unpublished PhD Thesis, , Concordia University (Canada).

Al-Hussein, M (1999) An integrated information system for crane selection and utilisation, Unpublished PhD Thesis, , Concordia University (Canada).

Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies, Unpublished PhD Thesis, , Concordia University (Canada).

Budawara, N (2009) Key performance indicators to measure design performance in construction, Unpublished PhD Thesis, , Concordia University (Canada).

El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects, Unpublished PhD Thesis, , Concordia University (Canada).

  • Type: Thesis
  • Keywords: decision support; optimization; project team; construction project; highway; highways; pipeline; tunnel; housing projects; programming; repetitive construction; scheduling
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304460117
  • Abstract:
    An object-oriented model is presented for optimized scheduling of repetitive construction projects such as: high-rise buildings, housing projects, highways, pipeline networks, bridges and tunnels. The model provides a number of practical features, and incorporates newly developed algorithms for scheduling of repetitive construction projects including: (1) a resource-driven scheduling algorithm for repetitive activities; (2) an interruption algorithm; and (3) an optimization procedure. The scheduling algorithm identifies the scheduled start and finish times as well as the assigned crew for each unit of a repetitive activity. The algorithm provides a schedule that complies with precedence relationships, crew availability and crew work continuity constraints, and considers the impact of a number of practical factors commonly encountered during scheduling. The interruption algorithm generates feasible interruption vectors for each repetitive activity in the project and provides added advantage over available formulations that consider arbitrary user-specified interruption vectors. The optimization procedure is based on a dynamic programming formulation. Unlike available dynamic programming formulations, the present formulation is capable of incorporating cost in the optimization process, thus offering valuable support to project team members in minimizing the overall cost of the project. For each repetitive activity in the project, the present model assists the planner in selecting the optimum crew formation and interruption vector from a set of possible alternatives. As such, the model can be used to evaluate the impact of different project acceleration strategies (i.e. multiple crews, increased crew size, overtime policies, or additional shifts) on the overall cost. The present model is implemented as a prototype software system. The system is developed as a 32-bit windows application that supports user-friendly interface including menus, dialog boxes, and windows. A number of application examples are analyzed to illustrate the use of the model and demonstrate its capabilities. The model can be used as a decision support system for generating optimized schedules for repetitive construction projects. This should contribute to cost-effective delivery of constructed projects.

Hammad, M M (2001) CPDICenter: Web-based virtual construction project document information center in support of claims preparation, Unpublished PhD Thesis, , Concordia University (Canada).

Hassanein, A (2003) Planning and scheduling highway construction using GIS and dynamic programming, Unpublished PhD Thesis, , Concordia University (Canada).

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks, Unpublished PhD Thesis, , Concordia University (Canada).

Iliescu, S (2000) A case-based reasoning approach to the designing of building envelopes, Unpublished PhD Thesis, , Concordia University (Canada).

Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects, Unpublished PhD Thesis, , Concordia University (Canada).

Li, J (2004) Web-based integrated project control, Unpublished PhD Thesis, , Concordia University (Canada).

Marzouk, M (2002) Optimizing earthmoving operations using computer simulation, Unpublished PhD Thesis, , Concordia University (Canada).

Meniru, K C U (2005) Computer-aided conceptual building design, Unpublished PhD Thesis, , Concordia University (Canada).

Morcous, G S L (2000) Case -based reasoning for modeling bridge deterioration, Unpublished PhD Thesis, , Concordia University (Canada).

Ravi, M (1998) Knowledge-based system approach to integrated design of multistorey office buildings at the preliminary stage, Unpublished PhD Thesis, , Concordia University (Canada).

Sadeghpour, F (2004) A CAD-based model for site layout, Unpublished PhD Thesis, , Concordia University (Canada).

Shehab-Eldeen, T (2002) An automated system for detection, classification and rehabilitation of defects in sewer pipes, Unpublished PhD Thesis, , Concordia University (Canada).